This IQC TES Field Manual includes all the exam and reference materials required for the CSTRA and the API Tank Entry Supervisor (TES) Certification Exams. The package includes the following: Publications, API, IQC RG's OSHA, CSTRA, ACGIH, and other applicable regulatory regulations, plus many helpful checklists and conversion tables.
- API 2015 - Safe Entry and Cleaning of Petroleum Storage Tanks, Planning and Managing Tank Entry From Decommissioning Through Re-commissioning.
- API 2016 - Guidelines and Procedures for Entering and Cleaning Petroleum Storage Tanks
- API 2026 - Safe Access/Egress Involving Floating Roofs of Storage Tanks in Petroleum Service
- API Pub. 2207 - Preparing Tank Bottoms for Hot Work
- API Pub. 2219 - Safe Operation of Vacuum Trucks in Petroleum Service
ACGIH (American Conference of Governmental Industrial Hygienists) Publication Threshold Limit Values [TLVs?] for Chemical Substances and Physical Agents In the Work Environment and Biological Exposure Indices [BEIs?], 2008 Edition 29 Code of Federal Regulations (29 CFR) Parts 1910 & 1926:
- CFR 1910.38 Employee Emergency Plans and Fire Prevention Plans
- CFR 1910.132-138 Subpart I - Personal Protective Equipment
- CFR 1910.146 Permit-Required Confined Spaces
- CFR 1910.147 Control of Hazardous Energy (Lockout/Tag out)
- CFR 1910.1000 (and following) Subpart Z "Toxic and Hazardous Substances"
- CFR 1910.1200 Hazard Communication
- CFR 1926.400-.449 Subpart K - Electrical
- OSHA 3007 Ground-Fault Protection on Construction Sites - 1998 (Revised)
- OSHA 3088 How to Plan for Workplace Emergencies and Evacuations - 2001 (Revised)
- OSHA 3151-12R Personal Protective Equipment - Revised 2003
- OSHA 3138-01R Permit-Required Confined Spaces - Revised 2004
- OSHA 3120 Control of Hazardous Energy [Lockout/Tag out] - 2002 (Revised)
- OSHA 3111 Hazard Communication Guidelines for Compliance - 2000 (Reprinted)
- OSHA 3084 Chemical Hazard Communication - 1998 (Revised)
- OSHA 3075 Controlling Electrical Hazards - 2002 (Revised)
- OSHA 2254 Training Requirements in OSHA Standards and Training Guidelines
- IQC RG 2122 Cribbing and Roof Stabilization Procedures
- IQC RG 2123 Safe Work and Execution Plan
- IQC RG 2124 Risk Assessments and Checklists
- IQC RG 2125 External and Internal Floating Roof Raising (air-bag) System Procedures
- IQC RG 2128 Confined Space Rescue Recommended Guidelines
- IQC RG 2129 Confined Space Entry Guidelines and Procedures
- IQC TES Calculation and Formulas, Conversion Tables, Checklist and Forms
Table of Contents
Subject | Tab |
1910.38 | A |
Instruction Outline | A |
Knowledge Exam | A |
Exam Preparation | A |
Regulation | A |
1910.132 thru 1910.138 | B |
Instruction Outline | B |
Knowledge Exam | B |
Exam Preparation | B |
Regulation | B |
1910.146 | C |
Instruction Outline | C |
Knowledge Exam | C |
Exam Preparation | C |
Regulation | C |
1910.147 | D |
Instruction Outline | D |
Knowledge Exam | D |
Exam Preparation | D |
Regulation | D |
1910.1000 | E |
Instruction Outline | E |
Knowledge Exam | E |
Exam Preparation | E |
Regulation | E |
1910.1200 | F |
Instruction Outline | F |
Knowledge Exam | F |
Exam Preparation | F |
Regulation | F |
1926.400 thru 1926.449 | G |
Instruction Outline | G |
Knowledge Exam | G |
Exam Preparation | G |
Regulation | G |
API 2015 | H |
Instruction Outline | H |
Knowledge Exam | H |
Exam Preparation | H |
Regulation | H |
API 2016 | I |
Instruction Outline | I |
Knowledge Exam | I |
Exam Preparation | I |
Regulation | I |
API 2026 | J |
Instruction Outline | J |
Knowledge Exam | J |
Exam Preparation | J |
Regulation | J |
API 2207 | K |
Instruction Outline | K |
Knowledge Exam | K |
Exam Preparation | K |
Regulation | K |
API 2219 | L |
Instruction Outline | L |
Knowledge Exam | L |
Exam Preparation | L |
Regulation | L |
Cribbing Plan | M |
Instruction Outline | |
Establishing Weight | |
Cribbing Stacks | |
Cribbing Loads | |
VLB's | |
Installation | |
Safe Work AST Floating Roof | N |
Instruction Outline | |
Anti-Rotation | |
Roof Stabilization | |
Inspection | |
Floating Roof Supports | O |
Instruction Outline | |
Raising Roof Cribbing/Jacks | P |
Collapsed Floaters | |
Air Bag Systems | |
Safe Work Plans | |
Safe Work and Execution Plans | Q |
JSA/JSC | |
Hazard Assessments | |
Tank Checklist |